Skip to content

TILAK BHUSAL / ENGINEERING TOOLS

Boiler blowdown.
Recover the heat.

Size the recovery. Follow the heat. Make the business case.

Required blowdown714.286

lb/h

Flash fraction14.902

%

Useful heat recovered173,599.255

Btu/h

Blowdown = 6.67% of makeup · 3.45% of total feedwater · Saturated boiler water 365.87°F

02 / TWO-STAGE HEAT RECOVERY

Every unit of heat, accounted for.

78.3% useful recovery
Blowdown heat balanceAll heat rates are referenced to incoming makeup water. Recovered flash 29.96 kW, makeup preheat 20.91 kW, losses 14.12 kW.RECOVERED FLASH102,236 Btu/h · 46.1%MAKEUP PREHEAT / HX71,363 Btu/h · 32.2%DRAIN / UNUSED HEAT48,168 Btu/h · 21.7%BLOWDOWN221,768Btu/h · 100%WASTE HEATThermal balance at the selected duty · Loss includes unused vapor and flash-condensate sensible heat
Recovered flash latent heat
102,236.128 Btu/h
Liquid-liquid HX duty
71,363.127 Btu/h
Drain / unused heat
48,168.373 Btu/h

Flash recovery credits latent heat only. The loss branch includes residual liquid, unused vapor and flash-condensate sensible heat, all above the makeup inlet reference.

03 / THE BUSINESS CASE

Avoided fuel costs

$13,549 / year

Estimated gross fuel savings at the entered operating duty

Fuel avoided1,693.65 MMBtu/yrNet annual savings$13,203

Includes both recovery stages. Maintenance and auxiliary electricity are deducted from net savings.

PROJECT RETURN

1.89 years

Simple payback · year-one net savings

Annual return on cost
52.8%
10-year NPV
$76,952
Annual operating costs
$346

04 / EQUIPMENT DUTY

Start with the thermal requirements.

Required liquid-liquid HX area
7.243 ft²
Required fresh makeup
10,714.286 lb/h
Final heated makeup
76.208 °F
Flash vapor generated
106.44 lb/h
Flash vapor volume
36.16 ft³/min
Residual liquid to HX
607.84 lb/h
Vapor-only diameter screen
3.35 in
Makeup leaving liquid HX
66.66 °F
HX effectiveness / NTU
70.08% / 1.256

One shell pass / two tube passes. Area excludes the flash condenser. The 3 m/s vapor-velocity diameter is a preliminary screen; vessel hold-up, internals, nozzles and pressure ratings still require manufacturer sizing. Maintain flash pressure through the residual-liquid exchanger.

05 / TEN-YEAR OUTLOOK

From installed cost to recovered value.

10-year project cash flowYear zero installed cost and ten years of net fuel savings. Year ten cumulative cash $107,032, net present value $76,952.CUMULATIVE CASH FLOW / USD-25k8k41k74k107k012345678910Green: cash · Gold: discounted cash · Horizontal axis: year
View annual cash flow table
Cumulative project cash flow (USD)
YearCashDiscounted cash
0-$25,000-$25,000
1-$11,797-$12,426
2$1,406-$450
3$14,610$10,956
4$27,813$21,818
5$41,016$32,163
6$54,219$42,015
7$67,422$51,399
8$80,626$60,335
9$93,829$68,846
10$107,032$76,952

Design checks

No screening thresholds exceeded for this scenario. Confirm water chemistry, coincident load and equipment duties before selection.

Thermal/economic estimate. Pressure-vessel construction, relief protection, control sequencing and final mechanical design are outside this tool.

THE THERMODYNAMICS BEHIND THE NUMBERS

Control the solids. Recover the energy.

01 / Blowdown mass balance

B / M = Cm / Cb

Makeup solids leave in blowdown. Clean condensate return reduces fresh makeup and required continuous blowdown.

02 / Flash separation

x = Δhf / hfg

The pressure drop converts part of the hot liquid into steam. Recovery depends on a simultaneous heat sink.

03 / Heat exchanger sizing

A = NTU × Cmin / U

A one-shell-pass thermal model relates the selected drain temperature to required fouled heat-transfer area.

Calculation basis, ABMA TDS limits & references

Steady continuous surface blowdown only; dry steam and returned process condensate contain negligible dissolved solids. Treatment-chemical solids, carryover, sludge and intermittent bottom blowdown are excluded. B = S(1-r)Cm/(Cb-Cm); M = S(1-r)+B. B/M = Cm/Cb. Percent makeup is not percent feedwater.

Boiler TDS is a user-approved operating limit, not automatically selected. Historical ABMA values are cited as reported by the National Board (1999); consult current manufacturer guidance and water chemistry, including silica, alkalinity and hardness. The default is an example, not an operating recommendation.

Pressures are gauge; atmospheric pressure is fixed at 1.01325 bar. Saturation properties use a 0.25°C numerical table generated from CoolProp IF97. Liquid enthalpy is approximated by saturated-liquid enthalpy at the same temperature, neglecting the small compressed-liquid pressure correction. Dissolved-solids effects on properties are neglected.

Flash fraction = (hf,boiler - hf,flash)/hfg,flash, assuming adiabatic throttling and equilibrium separation. All generated vapor counts toward flash-vessel flow, including any unused vapor. Diameter shown is only a vapor-disengagement screen at 3 m/s, not a vessel selection or pressure-vessel design.

The residual liquid stays at flash-vessel pressure through the liquid-liquid exchanger; pressure reduction occurs downstream to avoid secondary flashing in the exchanger. The makeup stream first passes through this exchanger, then an indirect flash-steam condenser. Flash condensate is NOT returned to the boiler in this model.

One shell pass and two tube passes: duty follows selected drain temperature; secant heat capacities preserve the enthalpy balance. Area = NTU*Cmin/U using the shell-and-tube effectiveness relation. U is a user-entered fouled value. Final area, tube velocity, fouling, corrosion allowance, pressure drop, traps and materials require vendor design. The flash condenser area is not included in the liquid-liquid HX area.

Only captured flash latent heat is credited, capped by remaining makeup heating demand. Flash-condensate sensible heat, unused vapor and residual liquid heat remain in drain/unused losses. Waste heat is referenced to incoming makeup enthalpy, so the three diagram branches sum to 100%. No condensate water-reuse savings are claimed.

Continuous coincident makeup and blowdown flow is assumed. Annual useful heat replaces fuel at the entered boiler efficiency; efficiency and fuel-price heating-value bases must match. Net savings subtract auxiliary electricity and annual maintenance. Installed cost includes the controller, flash vessel, condenser, exchanger and installation.

The 10-year chart shows cumulative undiscounted cash and discounted cash (NPV), beginning with installed cost at year zero. Fuel price alone escalates; operating hours and other annual costs stay fixed. Simple payback uses year-one net savings. Taxes, financing, incentives, replacements and automatic-controller water/chemical savings are excluded.

This is a preliminary thermal/economic sizing estimate, not an ABMA certification or a stamped mechanical design. Verify actual load coincidence, water chemistry, controls, drain conditions and pressure-vessel requirements before equipment selection.

References: National Board: historical ABMA water limits · DOE Steam Tip Sheet 9 · Spirax Sarco heat recovery guidance · IAPWS-IF97 properties · F-Chart effectiveness–NTU model.